1. That the Director approves the addition of
the Ringwood Town Centre Improvements (Phase 2) and A31 Slip Road
Closure scheme to the 2020/21 Capital Programme at a value of
£200,000. This is the second phase of this programme of works
to be funded by Highways England’s ‘Cycle, Safety and
Integration Designated Fund’ grant. The first phase will be
completed for £179,800, leaving £200,000 to fully fund
phase two of this programme of works.
2. That the Director notes the reduction in value of phase one of
this programme of works to £179,800 in the 2019/20 Capital
Programme.
3. That the Director approves the details of the Ringwood Town
Centre Improvements and A31 Slip Road Closure (Phase 2), as set out
in this paper.
4. That the Director gives approval to procure, spend and enter
into necessary contractual arrangements, In consultation with the
Head of Legal Services, to implement this scheme, at a total
estimated cost of £200k, to be funded from Highways
England’s ‘Cycle, Safety and Integration Designated
Fund’ grant.